Home > 31.5 MW methane boiler

31.5 MW methane boiler

About Us

Zozen Boiler main products include gas&oil boiler, coal-fired boiler, biomass boiler, thermal fluid heater and other series of more than 400 varieties of specifications.
Contact us for Email:[email protected]

Our Main Product

our main boilers
wns boiler picture

1-20 ton gas/oil fired boiler

Price: $12000-$450000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2 Mpa

Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

szs boiler picture

7-70 MW gas/oil fired hot water boiler

Price: $160000-$1800000/set

Capacity: 7-70 MW

Pressure: 1.0-1.6 Mpa

Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, hospital, colleges and universities.

szl boiler picture

2.8-29mw coal fired boiler

Price: $70000-$750000/set

Capacity: 2.8-29mw

Pressure: 1.0-1.25 Mpa

Fuel: Bituminous coal, lean coal, anthracite

Industries: Heating, hotels, schools, hospitals

yyw boiler picture

horizontal thermal fluid heater

Price: $12000-$350000/set

Capacity: 700 - 14000 kw

Pressure: 0.8 - 1.0 Mpa

Fuel: natural gas, coke oven gas, bio-gas´╝îliquid propane gas, diesel, heavy oil, light oil, crude oil

Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

dzl boiler picture

1-20 ton biomass fired boiler

Price: $12000-$350000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2.5 Mpa

Fuel: Biomass particles

Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

Numerical investigations of combustion and emissions of

Numerical investigations of combustion and emissions of syngas as compared to methane in a 200 MW package boiler. 200 MW package boiler. = 31.5 MJ/m

Technical and Economic Assessment of Coal Mine Methane

(from Glickert, 1997) Given: Coal-fired 340 MW boiler. methane has approximately 21 44.3 26.0 25.8 12.8 22.8 29.5 23.9 33.1 31.5 23.6

Numerical investigations of combustion and emissions of

Numerical investigations of combustion and emissions of syngas as compared to methane in a 200 MW package boiler 200 MW package boiler. 31.5 MJ/m3

System Design and Analysis of a Supercritical Thermal

System Design and Analysis of a Supercritical Thermal Power Plant with a capacity of 800 MW. SYSTEM DESIGN OF SUPERCRITICAL THERMAL POWER PLANT Up to 31.5

GIZ. (2012). Biomass Energy in the Philippines. pp.

5.2040 31.5% 6.8447 1 MW Biomass Energy Project for Pepsi Rosario, La Union Sure PEP, Inc. 1.00 0.00 14.8 MW Montalban Landfill Methane

OVERVIEW OF U.S. AND INTERNATIONAL CMM/CBM

Coalbed Methane Terminology Coalbed Methane (CBM) Coal Seam Methane 1.2 MW power generation *a few projects account for a large extent of utilization activity

Industrial Boilers: Fuel Switching Methods, Costs, and

and Oil to Coal 31 5. Factors Affecting Fuel Switching 112 fuel switching method is boiler for a 4.4 MW boiler to

Last updated October 2005

(31.5 MW) Validation of Fuel Validation of the Paramonga CDM Bagasse Boiler Project (1 MW) Validation of the Bumibiopower Methane Extraction and Power

Technical and Economic Assessment of Coal Mine Methane

(from Glickert, 1997) Given: Coal-fired 340 MW boiler. methane has approximately 21 44.3 26.0 25.8 12.8 22.8 29.5 23.9 33.1 31.5 23.6

Numerical investigations of combustion and emissions of

Numerical investigations of combustion and emissions of syngas as compared to methane in a 200 MW package boiler 200 MW package boiler. 31.5 MJ/m3

System Design and Analysis of a Supercritical Thermal

System Design and Analysis of a Supercritical Thermal Power Plant with a capacity of 800 MW. SYSTEM DESIGN OF SUPERCRITICAL THERMAL POWER PLANT Up to 31.5

GIZ. (2012). Biomass Energy in the Philippines. pp.

5.2040 31.5% 6.8447 1 MW Biomass Energy Project for Pepsi Rosario, La Union Sure PEP, Inc. 1.00 0.00 14.8 MW Montalban Landfill Methane

OVERVIEW OF U.S. AND INTERNATIONAL CMM/CBM

Coalbed Methane Terminology Coalbed Methane (CBM) Coal Seam Methane 1.2 MW power generation *a few projects account for a large extent of utilization activity

Industrial Boilers: Fuel Switching Methods, Costs, and

and Oil to Coal 31 5. Factors Affecting Fuel Switching 112 fuel switching method is boiler for a 4.4 MW boiler to

Last updated October 2005

(31.5 MW) Validation of Fuel Validation of the Paramonga CDM Bagasse Boiler Project (1 MW) Validation of the Bumibiopower Methane Extraction and Power

Potential applications of renewable energy sources

This paper describes the potential applications of renewable energy sources to replace fossil biomass combustion problems in boiler power 31.5: 49.0: 214.6:

Coal Mine Methane Country Profiles, Chapter 20,

Underground (active) 31.5 (2009) 15 in The methane currently drained from the mine is being used for boiler fuel in five methane include

Reduction of NOx Emissions from the Gas Turbines

31 5.6.2 Emissions NMVOC Non-Methane Volatile Organic Compounds - hours before the boiler has reached high enough steam pressure.

Coal Mine Methane Country Profiles

31.5 (2009) 15 (2010) Surface from the mine is being used for boiler fuel in Project in Taldykuduk Area of Central Kazakhstan, Kazakhstan Methane Information

Biomass gasification technologies for advanced

- Status and Present RD activities in Finland Esa Kurkela FINNISH 50 MW gas to boiler, (1.1.2004-31.5.2007) VTT,TKK, Foster Wheeler,

PROJECT DESIGN DOCUMENT FORM (CDM PDD) -

Jincheng Chengzhuang 18 MW Coal Mine Methane Power Generation Project Version 1 All of the methane utilized in this project activity comes from CMM and no CBM is

HIGH EFFICIENCY CARBONATE FUEL CELL/TURBINE

2.85 MW POWER PLANT: Methane is internally reformed in the fuel cell at an H O/C ratio of2 condenser and condensate and boiler feed pumps.

GET Support & Price

Please Feel free to give your inquiry in the form below.We will reply you in 24 hours