Home > 90 ton metallurgy steam boiler

90 ton metallurgy steam boiler

About Us

Zozen Boiler main products include gas&oil boiler, coal-fired boiler, biomass boiler, thermal fluid heater and other series of more than 400 varieties of specifications.
Contact us for Email:[email protected]

Our Main Product

our main boilers
wns boiler picture

1-20 ton gas/oil fired boiler

Price: $12000-$450000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2 Mpa

Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

szs boiler picture

7-70 MW gas/oil fired hot water boiler

Price: $160000-$1800000/set

Capacity: 7-70 MW

Pressure: 1.0-1.6 Mpa

Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, hospital, colleges and universities.

szl boiler picture

2.8-29mw coal fired boiler

Price: $70000-$750000/set

Capacity: 2.8-29mw

Pressure: 1.0-1.25 Mpa

Fuel: Bituminous coal, lean coal, anthracite

Industries: Heating, hotels, schools, hospitals

yyw boiler picture

horizontal thermal fluid heater

Price: $12000-$350000/set

Capacity: 700 - 14000 kw

Pressure: 0.8 - 1.0 Mpa

Fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

dzl boiler picture

1-20 ton biomass fired boiler

Price: $12000-$350000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2.5 Mpa

Fuel: Biomass particles

Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

Babcock Wilcox Company Supercritical (Once

Babcock Wilcox 5 Table 1 Supercritical UP Boiler Size Evolution Nominal SH Outlet Steam Contract Capability Pressure Temperature Startup Number Utility Station MWe

Failure Characteristics Of Boiler Pipes In

Journal of Babylon University/Engineering Sciences/ No.(1)/ Vol.(20): 2012 87 Failure Characteristics Of Boiler Pipes In Al-Emsaeb Electric Power Plants

Untitled Document [www.boilersmith.com]

FACILITIES PROPERTY: 13 acres PLANT AREA: 50,000 sq. ft. OFFICE AREA: 2,000 sq. ft. ENGINEERING: Boilersmith Ltd. offers several standard firetube boiler designs.

Young guy looking to buy a Port Huron steam engine

SmokStak SmokStak® Old Iron and Tractor Community Steam Stationary Engines, Traction Engines, Steam Boats: Young guy looking to buy a Port Huron steam engine is

Stanier locomotives; also those of Fairburn and

Whereas it was desirable to separate Fowlers and Hughes designs for the LMS: those of Stanier and his lesser successors (Fairburn and Ivatt) need to be treated together

Turbine exhaust steam quality - Eng-Tips

Im looking for suggestions regarding the minimum recommended exhaust steam quality (for a condensiing steam turbine..obviously) consistent with a 3 year

KUBOTA ENGINE (THAILAND) CO.,LTD. « Industrial

ZU HOW INDUSTRY (THAILAND) CO., LTD. Metal products such as water tanks and Boiler steel pipe, steel pipe, tunnel construction and fittin..

Heat rate of coal fired power plant - SlideShare

Apr 01, 2013 · Heat rate is the single paramter that can tell the health of a power plant similar to the pusle rate of a person tells about ones health.

Wet sulfuric acid process - Wikipedia, the free

The wet sulfuric acid process (WSA process) is one of the key gas desulfurization processes on the market today. Since the Danish catalyst company Haldor Topsoe

Steam at 50th annual show - Prairie Village

Fellow steam enthusiasts, Prairie Village (just west of Madison, SD) is having their 50th annual Steam Threshing Jamboree this year. The exact dates are Thursday

Nova Scotia Powers Point Aconi plant overcomes

Home / Coal / Nova Scotia Powers Point Aconi plant overcomes CFB design problems to become rock of reliability; Nova Scotia Powers Point Aconi plant overcomes

Rules of thumb for chemical engineers - SlideShare

Mar 31, 2014 · Regras práticas para engenheiros químicos Rules of thumb for chemical engineers 1. l V 3 N O I L L I ~ H I 2. Rules of Thumb for Chemical Engineers

Continental engineers - Steamindex homepage

Continental engineers. This is an arbitrary division forced by the limitations involved in handling large files. Abt, Roman Born in Bunzen, Switzerland on 17 July

RMS Titanic - Wikipedia, the free encyclopedia

RMS Titanic was a British passenger liner that sank in the North Atlantic Ocean in the early morning of 15 April 1912 after colliding with an iceberg during her

Used Oil Field Pipe For Sale, Used Oil Field Pipe

Tags: Erw Oil Pipe Oil And Gas Pipe Fitting Used Oil Field Pipe For Sale | Oil And Gas Steel Pipes Water Well Casing Used Oil Field Pipe For Sale | Petroleum Casing

The T1 Trust

The Mechanical Engineering Committee is especially seeking individuals with various skill sets to include but not limited to. Metallurgy

title search - The McIlvaine Company

E.ON. E.ON is one of the top 200 purchasers of flow control and treatment equipment. E.ON owns generating plants with different fuels. It is setting up a new company

The Engineer 1960 Jan-Jun: Index - Graces Guide

The Engineer 1960 Jan-Jun - View the Volumes Note: There is an extended index at Volume 209 Index A A. B. Asbrink and Co., Small Pneumatic Hammer, 837

Wet surface air coolers minimize water use by

Home / Water / Wet surface air coolers minimize water use by maximizing heat transfer efficiency; Wet surface air coolers minimize water use by maximizing heat

Master Timeline for SMP Project - Koehnline

Master Timeline. For How the Green Line Came to Crown Hill A background reference work . for a public art installation at the northern terminus of the Green Line

GET Support & Price

Please Feel free to give your inquiry in the form below.We will reply you in 24 hours