Home > s/s panel flue type gas water boilers

s/s panel flue type gas water boilers

About Us

Zozen Boiler main products include gas&oil boiler, coal-fired boiler, biomass boiler, thermal fluid heater and other series of more than 400 varieties of specifications.
Contact us for Email:[email protected]

Our Main Product

our main boilers
wns boiler picture

1-20 ton gas/oil fired boiler

Price: $12000-$450000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2 Mpa

Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

szs boiler picture

7-70 MW gas/oil fired hot water boiler

Price: $160000-$1800000/set

Capacity: 7-70 MW

Pressure: 1.0-1.6 Mpa

Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, hospital, colleges and universities.

szl boiler picture

2.8-29mw coal fired boiler

Price: $70000-$750000/set

Capacity: 2.8-29mw

Pressure: 1.0-1.25 Mpa

Fuel: Bituminous coal, lean coal, anthracite

Industries: Heating, hotels, schools, hospitals

yyw boiler picture

horizontal thermal fluid heater

Price: $12000-$350000/set

Capacity: 700 - 14000 kw

Pressure: 0.8 - 1.0 Mpa

Fuel: natural gas, coke oven gas, bio-gas´╝îliquid propane gas, diesel, heavy oil, light oil, crude oil

Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

dzl boiler picture

1-20 ton biomass fired boiler

Price: $12000-$350000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2.5 Mpa

Fuel: Biomass particles

Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

Series LC/LCE Gas, Oil, Combination Gas/Oil - Peerless Boilers

A. The boiler(s) shall be of a low pressure, cast iron, wet base forced draft design (LC has a rear flue outlet, LCE has a top flue outlet.) D. The boiler(s) shall be provided with a (float type) (probe type) low water cut-off. . The burner(s) shall be furnished with a prewired control panel incorporating an electronic combu

V11H SERIES PRESSURE FIRED BOILER-BURNER - Burnham

V-11H______, ______ (steam or water), ______ (2 Oil, Nat. or LP Gas, 2 Oil and Nat. or LP Gas) pressure fired boiler-burner unit(s), having an AHRI approved gross output of ______ MBH per boiler Jacket will have removable side panels so that the (b) shall be manual reset type suitable for 115 volt 60 Hz.

4WI Specifications - Hot Water (doc) - Cleaver-Brooks

A. Manufacturers Certification: The boiler manufacturer shall certify the following: Model 4WI _____ natural gas (combination Gas/Oil fired) hot water boiler(s) with . A low water cutoff control (manual reset) shall be mounted on the top . For combination gas-oil fired boilers the panel shall contain the fuel selector sw

Good Practices For Gas Piping And Appliance - Questar Gas

on the job site that (s)he has completed an approved certifica- tion exam, a Journeyman .. the removal of an access panel, door or similar obstruction covering the item Low pressure hot-water heating: A boiler furnishing hot water at pressures CHIMNEY, TYPE A - Chimneys or vents of masonry rein- forced concrete

Installation Operation Manual - Navien NCB Combi-boiler

Keep this manual near this boiler for future reference whenever . Do not turn on the boiler unless the water and gas supplies are fully .. pump(s) off cycle. .

Natural Gas Water Heaters | American Gas Association

A storage water heater works by taking cold water from the home s water supply we breathe) are vented to the outdoors through a chimney, flue or sidewall vent. Homes that use hot water or steam from a gas boiler for space heating can also This type of venting allows gas water heaters to be installed as far as 40 feet.

Archive I O Manual RW90-500 - Lochinvar

Water Heater/Domestic Hot Water Supply Boiler NOTE: Retain this manual for future reference. SPECIAL on the side of the control panel to allow the boiler to function. Larger combination gas valve(s) is adjustable to supply proper.

GAS 460 S - Remeha

manual. DHW: Domestic hot water. 1.2 General. Congratulations on your choice of a high quality . Gas 460 S boilers are delivered with a K control panel.

Technical Data Manual - Viessmann

Technical Data Manual. 5773 596 - 03 06/2014 For closed loop hot water heating systems with maximum supply water The flue gas temperature is only approximately 9-27 F. (5 - 15 C) .. in multi-boiler installations, provided the side panel removal is not . PP(s) venting system for Vitocrossal 200 CM2 boilers. MG /

scotch marine firetube hot water boiler manual - Superior Boiler Works

TOT: Top of tubes; the highest point in the boiler where flue gas passes though tubes. Set point: A .. Examples of electrical panels junction boxs: Figure 31 . Water column(s) must be added to the boiler to accommodate any float style.

Sample Specifications - Bryan Boilers

Forced Draft Gas, Oil, Gas/Oil Fired The water boiler shall be manufactured in strict accordance with the ASME Heating All access panels shall be affixed to the pressure vessel frame and insulated with 2 Manual reset type high limit; Manual reset type low water cutoff; Auxiliary low water cutoff(s); Low water cutoff.

RV Water Boiler Sample Specification - Bryan Boilers

The boiler shall be a Bryan Model ______ flexible water tube water boiler, with a fuel supply(s), relief valve discharge, building management controls and flue-gas vent. The boiler will require a positive pressure type metal flue. cam gas metering valve (RV500 to RV800); Burner mounted control panel containing:.

INSTALLATION, OPERATION, AND SERVICE MANUAL

MANUAL. RESIDENTIAL STORAGE TYPE GAS WATER HEATER .. Do not cover any access panels leading to burner compartments. Do not cover .. room(s) within the building, the total volume of the room(s) must be of sufficient . DO NOT use with piping that has been treated with chromates, boiler seal, or other

CGa Boiler Manual Series 1 - Weil-McLain

GOLD CGa Gas-Fired Water Boiler Boiler Manual. 2. Part Number . s to boiler. s off, do not turn off or disconnect electrical supply to circulator. Instead, shut Provide at least screwdriver clearance to jacket front panel screws for removal of

Series 62 Atmospheric Gas-Fired Boilers - Peerless Boilers

A. The boiler(s) shall be of a low pressure, cast iron, atmospheric gas design and shall be D. The boiler(s) shall be provided with a (float type) (probe type) low water cut-off. and shall include a manual shut-off gas valve, gas pressure regulator *(Add suffix P for ignition system with prewired control panel and specify

Series LC/LCE Gas, Oil, Combination Gas/Oil - Peerless Boilers

A. The boiler(s) shall be of a low pressure, cast iron, wet base forced draft design (LC has a rear flue outlet, LCE has a top flue outlet.) D. The boiler(s) shall be provided with a (float type) (probe type) low water cut-off. . The burner(s) shall be furnished with a prewired control panel incorporating an electronic combu

V11H SERIES PRESSURE FIRED BOILER-BURNER - Burnham

V-11H______, ______ (steam or water), ______ (2 Oil, Nat. or LP Gas, 2 Oil and Nat. or LP Gas) pressure fired boiler-burner unit(s), having an AHRI approved gross output of ______ MBH per boiler Jacket will have removable side panels so that the (b) shall be manual reset type suitable for 115 volt 60 Hz.

4WI Specifications - Hot Water (doc) - Cleaver-Brooks

A. Manufacturers Certification: The boiler manufacturer shall certify the following: Model 4WI _____ natural gas (combination Gas/Oil fired) hot water boiler(s) with . A low water cutoff control (manual reset) shall be mounted on the top . For combination gas-oil fired boilers the panel shall contain the fuel selector sw

Good Practices For Gas Piping And Appliance - Questar Gas

on the job site that (s)he has completed an approved certifica- tion exam, a Journeyman .. the removal of an access panel, door or similar obstruction covering the item Low pressure hot-water heating: A boiler furnishing hot water at pressures CHIMNEY, TYPE A - Chimneys or vents of masonry rein- forced concrete

Installation Operation Manual - Navien NCB Combi-boiler

Keep this manual near this boiler for future reference whenever . Do not turn on the boiler unless the water and gas supplies are fully .. pump(s) off cycle. .

GET Support & Price

Please Feel free to give your inquiry in the form below.We will reply you in 24 hours