Home > fit plus steam ganreter steam boilar in delhi 12 kw

fit plus steam ganreter steam boilar in delhi 12 kw

About Us

Zozen Boiler main products include gas&oil boiler, coal-fired boiler, biomass boiler, thermal fluid heater and other series of more than 400 varieties of specifications.
Contact us for Email:[email protected]

Our Main Product

our main boilers
wns boiler picture

1-20 ton gas/oil fired boiler

Price: $12000-$450000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2 Mpa

Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

szs boiler picture

7-70 MW gas/oil fired hot water boiler

Price: $160000-$1800000/set

Capacity: 7-70 MW

Pressure: 1.0-1.6 Mpa

Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, hospital, colleges and universities.

szl boiler picture

2.8-29mw coal fired boiler

Price: $70000-$750000/set

Capacity: 2.8-29mw

Pressure: 1.0-1.25 Mpa

Fuel: Bituminous coal, lean coal, anthracite

Industries: Heating, hotels, schools, hospitals

yyw boiler picture

horizontal thermal fluid heater

Price: $12000-$350000/set

Capacity: 700 - 14000 kw

Pressure: 0.8 - 1.0 Mpa

Fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

dzl boiler picture

1-20 ton biomass fired boiler

Price: $12000-$350000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2.5 Mpa

Fuel: Biomass particles

Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

Technical Standards for Construction of -

N0; 211] NEW DELHI, FRIDAY, AUGUST 20,2010/SHRAVANA 29, 1932. CENTRAL steam generator (boiler) can deliver continuously at rated parameters; . kW, in reiation to hydraulic turbine, . Copiesaof fit-hie. projectgldesiign; descfiption, . open) condition plus continuous steam requirement for auxiliary systems.

Engineering Thermodynamics | Zeeshan Sohail -

Components of a modern steam power plant Nuclear Power Plant Internal Combustion Engines 1.3.1. 113 1 1 2 3 4 4 4 4 5 7 7 7 8 8 9 10 10 12 13 1.2. 1.3. .. 75 m kgf/sec = 0.1757 kcal/sec = 735.3 watt 1 kW = 1000 watts = 860 kcal/ h 5. . After expanding in high pressure turbine steam is taken to the reheat boiler and

power plant engineering | Hardian Bara -

His areas of interest include circulating fluidized bed boilers, combined cycle City Milan Montreal NewDelhi Santiago Seoul gingapore Sydney Taipei Toronto . Analysis of Steam Cycles 2.1 Steam Power Plant 38 2.2 Rankine Cycle 39 2.3 . Capacity factor (or plant factor), average load 12 = rated capacity of the plant

Modern boiler design

Introducing modern boiler concepts in the design of thermal power stations is nowadays Optimized design for main steam piping to fit elevated design parameters issued in January 2010 for the conference in Delhi. . temperature up to 500 °C. Such a membrane wall design using fully T12 is .. (electrical) 1 x 22 kW.

Department of Labor and Workforce Development |

12:90-4.7, Steam boiler blowdown tanks and receivers 12:90-8.5, Eligibility for low pressure boiler operators license (black seal) . No unlicensed person shall operate a steam generator, similar equipment .. If the inspector finds such vessel fit for use he shall deliver to the owner evidence of approval for further use .

Autoclave (industrial) - Wikipedia, the free

Steam autoclaves, for example, can be exposed to an internal vacuum if the steam . but they may sometimes be safer because they generally cannot move the . temperature of 300 °F (149 °C) in one hour will take some 90 kilowatts of power. If local laws require the licensing of high-pressure boiler operators, this can

cogen2 - Distributed Power

Heat Recovery Solutions Technology a perfect fit . gine, a generator and an auxiliary unit including the turbocharger. . performance is a huge plus. . Both the 12V275GL+ and 16V275GL+ engines are . a steam power plant uses except the working fluid has a much 250°F (121°C) and transforms it into 125 kW.

board of directors management committee - Bharat

Sep 25, 2002 High Pressure Boiler Plant. Seamless Steel Tube BHEL at a Glance. 12. Five Year Summary. 14. Directors Report. 15 (Tansen Marg), New Delhi-110001, to transact the following business: To consider and, if thought fit, to pass with or without and Generator sets of 660 MW, Steam Turbines of two.

Supply-side management - REEEP / UNIDO Training

Page 12 distribution is also promoting fuel switching in Delhi. The share of gas in power produce steam for electricity generation in a conventional steam turbine; .. The equation for the best-fit line indicates efficiency of the boiler: . pressure and a steam turbine to drive an electricity generator. plus electricity);.

Thermodynamic performance evaluation of solar and

Jun 5, 2015 Automatic Zoom, Actual Size, Fit Page, Full Width, 50%, 75%, 100%, 125%, 150 %, 200%, 300%, 400%. More Information Less Information.

2003 Patt. - University of Pune

b) Design a control panel for Boiler assuming 3 element drum level control and air-fuel b) Discuss steam pipe sizing based on flowrate and maximum velocity of . collector is located in New Delhi (28°35N, 77°12E), and is tilted at . ii) The input power at pump shaft in kW. . types of fits with appropriate examples? [9].

24.03.2014 - Punjab State Electricity Regulatory

Mar 24, 2014 New Delhi-110057 through Shri Balwant Singh Grewal, Chief new 12 MW back pressure Turbine Generator (TG) set with boiler as per latest from other agencies, the project was commissioned with a load of only 500 kW on MW capacity is running on co-generation mode with exhaust steam being

Exergoeconomic analysis and optimization of an

Jan 11, 2015 Also cost of electricity produced by steam turbine and gas turbine in the optimum design of the ISCCS are about 7.1% and 1.17% lower with

93rd Annual Report FY12 - Tata Power

Dec 23, 2011 To consider and, if thought fit, to pass with or without modification, the .. The last boiler i.e. for Engineering, Procurement Commissioning, Steam Generator .. The tariff order for FY12 released by Delhi Electricity Regulatory at rates which factored a power purchase cost of ` 4.06 per unit (plus fuel

Annual Report for the year 2013-14 - Gujarat State

Aug 8, 2014 To consider and if thought fit, to pass the following resolution with or without plus service tax and reasonable out of pocket and traveling .. Governor of Delhi for . March 31, 2014 as against Rs. 6253 Crores (FY 12-13) down 13% when .. will reduce NG consumption at Steam generator boilers.

Application for Tenders - Adikavi Nannaya

12. Study of magnetic hysteresis loops of Ferro magnetic materials(B-H curve) without CRO. Make: SES characteristics Make : Mittal Enterprises Delhi. 2. 15 . RIC-24 Plus-. Remi. 1 Length (Metric) Exterior 57cm Power Consumption 2.5kW. Thermo . Steam Boiler for Milk, Rice Vegetable a. Steam Generator. 1 b.

Despite Challenges, India Banks on Renewable

May 1, 2014 Facebook · Twitter · LinkedIn · Google Plus . The 12th Plan (201217) now aims for RE capacity additions of Projects ranging between 100 kW and 2 MW and connected to the with ownership of one or two wind turbine generator installations. Indias FIT was introduced in 1995 when the Ministry of

College Brochure - Sona College of Technology

12. Indias Best. Engineering Colleges. 2012 by careers 360. One Among. Top Engineering . Steam Boiler and Turbo Generator Test Rig. · Air Conditioning

PDF (10686 KB) - McGraw-Hill eBook Library

Mexico City Milan New Delhi San Juan Seoul Massachusetts, and in GEs Large Steam Turbines Department in Heat Recovery Steam Generator / 87 .. Velox boiler with combustion under pressure, charged by the gas turbine . effects of the rotating blade, and this calls for a proper fit of the dovetail at the root of the.

Annual Report 2010 - Thermax

Mar 31, 2011 8. Directors Report. 12. Management Discussion and Analysis. 23. Corporate .. in the areas of waste heat recovery, steam and happy to

GET Support & Price

Please Feel free to give your inquiry in the form below.We will reply you in 24 hours